Steel Structure Platform, multi storey apartment, steel building modern design
Material:
steel
Steel frame:
steel structure
Door:
steel security door, single swing door, glass door
Window:
PVC/Plastic Steel/Aluminum Alloy window
Size:
Customer Required
Crane:
as per customers' need
Connection type:
welding,bolted,riveting
Design software:
PKPM,AUTOCAD,3D3S, Tekla
Supply Ability
Supply Ability:
10000 Square Meter/Square Meters per Month prefab multi sotrey apartment building low cost
Packaging & Delivery
Packaging Details
container or as per customers' request.
1. For main steel frame,20'GP 17.5 tons,40'GP 22 tons,40'HQ 22.5 tons
2. Single steel sheet OR sandwich panel without packing loaded in 40'GP, or with packing loaded in 40'HQ
large span steel frame workshops
Port
Qingdao Port or Shanghai Port
Online Customization
Video Description
Product Description
Item
Details
Product name
Industrial warehouse storage use Steel structure mezzanine floor steel platform
Material
Standard
GB, ASTM, AISI, DIN
Dimensiton & Shape
Customized
Steel frame
1. Welded or hot-rolled H section column & beam used to build up STEEL PLATFORM WAREHOUSE.
2. Steel pipe, steel rod or steel angle are used to build up frame elevation of roof & wall if sandwich panel is used for cladding system.
3. C/Z section channel (surface treatment is hot glavanized) are used as purlins for cladding system.
4. Galvanized steel rod and steel pipe are used to strengthen the connection between purlins.
5. Steel angle is used to enhance the connection between purlins and cloumns or beams.
6. Crane can be customized according to customer's request.
Cladding system
1. Wall: brick wall or Corrugaed single sheet or sandwich panel (rock wool, galss wool, PU, EPS)
2. Floor: galvanized floor decking sheet or steel rod floor trusses then concrete
3. Roof: galvanized floor decking sheet or steel rod floor trusses then concrete
or with roof slope use single sheet or sandwich panel
Surface treatment
Hot galvanized or re oxide primer
Painting thickness
Customized, no less than 125 micrometer
Fireproof painting
As per customer's request, with CE certificate
Application
Prefabricated steel frame warehouse, small warehouse
Design software
PKPM, 3D3S, TKELA, AUTOCAD
MOQ
200 sqm
Trade terms
FOB or CIF
Payment terms
Deposit 30% T/T, balance shall be paid before shipment.
Package & loading
As per your request, 20'GP 17.5tons, 40'GP 22tons
Delivery days
35 days after receiving the deposit.
Steel frame
Welded or hot rolled H section column and beam are used to build up the steel frame and steel pllatform. Less weight but much more strong for prefab industrial buildings.
All small components are welded together in our facoty, no further re-work on the job site. Easy to install and disassemble.
Connection with the foundation
Anchor bolts are used to connect steel column with the foundation.
Sriffeners are used to enhance the links bwtween columns and foundation. Strength the connection to foundation foor commercial residential steel platform..
Roof steel frame--with roof slope
C or Z section channels (surface treatment is galvanized, no easy to rust) are used to build up the roof steel frame. Cable bracing are used to enhance the links bewteen two steel frame.
Roof steel frame--without roof slope
Steel frame is similar with the floor frame, H section beam is used to build up steel platform. Connection between cloumns and beams are high strength bolts.
Item 2: New building material: steel rod truss floor, which is much more easy to install and fast.
Wall framing elevation--not brick wall
Both sidewall and endwall use C ection channels (surface treatment is galvanized) for the cladding system.
Connection type is plain bolts, usually model M12 is widely used.
Cladding system
For cladding system, there are four types:
1. Single corrugated sheet, thickness and model are customized.
2. Sandwich panel with the insulation of EPS, rock wool, or PU.
3. Double corrugated sheet with the insulation of glassfiber wool or rock wool.
4. For roof, single corrugated sheet and fiberglass wool are used, but for wall only use single corrugated sheet.
Detailed Images
Steel frame
Beam or column in variable cross-section can also be produced.
Protection
After painting ,we will take measures to protect the painting , especially the edge of steel components.
Painting make-up
Painting make-up work will be done on the job site.
Packing & Delivery
Packing: according to the container size and customer's requirement 20'GP 2.34x2.18x5.7m, 17.5tons 40' GP 2.34x2.18x11.8m, 22tons 40'HQ 2.34x2.71x13.58m,29tons
Delivery time: 20-35 days after receiving the deposit.
Our Service
Professional design
50+ managerial and technical staff, 15 years experience in steel projects , 3 years experience of overseas construction projects.
Excellent construction quality
160+ experienced workers in steel components production, 90+ experienced workers on job site of steel frame construction.
Low cost
As a manufacturer and contractor, we have our won factory and constructionn team. Offer the integrated system solution.
Short building cycle
All components are prefabricated and finished in our factory, no need re-work on the job site. Also, detailed drawings and construction drawings will give you as installation instructions.
Enviromental protection
Components for steel frame are made of carbon steel. Cldding system is made of single sheet or sandwich panel.
High secure and reliable
By using steel materials, which is less weight but strong enough, the whole steel frame has thermal insulation, wind performance
Our Company
Item
Description
Company name
Juya Steel Structure Engineering Co., Ltd
Factory area
25000 sqm
Staff
300+
Certification
ISO9001 & ISO14001 & Safety in Production & Overseas Contracting Project Qualification
Production capacity
10000sqm/month
Product
We can offer the integrated system solution from designing to manufacturing and installation
Main production line
1. Two for steel structure industural buildings like warehouse, workshop, shopping mall, exhibition hall, car garage etc.
2. One for light steel structure muti-storey commercial buildings like hotel, apartment.
3. One for large span space heavy steel structure, like bridge and electricity tower
4. Complete machines for metal building materials production
Representative projects
1. Leather production factory for PT. LIPPO GROUP, Jakarta, Indonesia
2. Heat treatment workshop in Ghana, Africa
3. Steel frame workshop and multi storey office in Bratislava, Slovakia
4. Material production workshop for Luoyang Refractory (Group) Co., Ltd.
5. Production workshop for China Silicon Corporation Ltd.
Factory
Office building
Complete machines
Related Products
Low cost steel metal workshop
Multi storey steel office/workshop
Modern deisgn steel office
FAQ
1. What's the quality grade of the steel structure components?
Reply: Grade Q235B is used ,Q345B is also available if needed.
2. How about the derust grade? Reply: For the main steel structure,the derust grade is ball blasting Sa 2.5,and manual derust St2.0 on secondary steel structure.
3. How to install? Reply: We will supply with the detailed construction drawings as the construction munual to help you erect and install the building step by step.
4.How about the delivery time? Reply:Usually within 35 days after receiving the deposit, also depends on the quantity.